| 1-hour TSP Monitoring Results | |||||||||||
| Station CM_AB1a, The Hong Kong Ice and Cold Storage (Aberdeen) | |||||||||||
| Start | Finish | Weather | TSP Concentration | Action Level | Limit Level | Site Conditions / | Temperature | Wind Speed | Sampler | Filter | |
| Date | Time | Time | (µg/m3) | (µg/m3) | (µg/m3) | Observations / Remarks | (°C) | (m/s) | ID | ID | |
| 06/07/2011 | 09:09 | 10:09 | Cloudy | 14 | 283 | 500 | Loading and drilling | 29.7 | <5 | LD-3B-001 | N/A |
| 10:09 | 11:09 | Sunny | 11 | 283 | 500 | Loading and drilling | 29.7 | <5 | LD-3B-001 | N/A | |
| 11:09 | 12:09 | Sunny | 11 | 283 | 500 | Loading and drilling | 29.7 | <5 | LD-3B-001 | N/A | |
| 12/07/2011 | 13:35 | 14:35 | Drizzle | 101 | 283 | 500 | Loading and Ooperation of excavator | 27.6 | <5 | LD-3B-001 | N/A |
| 14:35 | 15:35 | Drizzle | 76 | 283 | 500 | Loading and Ooperation of excavator | 27.6 | <5 | LD-3B-001 | N/A | |
| 15:35 | 16:35 | Drizzle | 73 | 283 | 500 | Loading and Ooperation of excavator | 27.6 | <5 | LD-3B-001 | N/A | |
| 18/07/2011 | 09:07 | 10:07 | Drizzle | 181 | 283 | 500 | Loading and Ooperation of excavator | 27.9 | <5 | LD-3B-001 | N/A |
| 10:07 | 11:07 | Drizzle | 140 | 283 | 500 | Loading and Ooperation of excavator | 27.9 | <5 | LD-3B-001 | N/A | |
| 11:07 | 12:07 | Drizzle | 112 | 283 | 500 | Loading and Ooperation of excavator | 27.9 | <5 | LD-3B-001 | N/A | |
| 22/07/2011 | 13:00 | 14:00 | Sunny | 23 | 283 | 500 | Loading and Ooperation of mobile crane | 29.5 | <5 | LD-3B-001 | N/A |
| 14:00 | 15:00 | Sunny | 22 | 283 | 500 | Loading and Ooperation of mobile crane | 29.5 | <5 | LD-3B-001 | N/A | |
| 15:00 | 16:00 | Sunny | 21 | 283 | 500 | Loading and Ooperation of mobile crane | 29.5 | <5 | LD-3B-001 | N/A | |
| 28/07/2011 | 09:16 | 10:16 | Drizzle | 28 | 283 | 500 | Loading, ooperation of mobile crane and mud out | 30.1 | <5 | LD-3B-001 | N/A |
| 10:16 | 11:16 | Drizzle | 36 | 283 | 500 | Loading, ooperation of mobile crane and mud out | 30.1 | <5 | LD-3B-001 | N/A | |
| 11:16 | 12:16 | Drizzle | 34 | 283 | 500 | Loading, ooperation of mobile crane and mud out | 30.1 | <5 | LD-3B-001 | N/A | |
| Min. | 11 | ||||||||||
| Max. | 181 | ||||||||||
| Average | 59 | ||||||||||